FORSVARSKOMMANDOBESTEMMELSE M.607-2 om grundlæggende principper for logistisk samarbejde mellem EUROGROUP lande.
Læs kilden ved Retsinformation (åbner i ny fane)
Teksten
FORSVARSKOMMANDOBESTEMMELSE M.607-2 om
grundlæggende principper for logistisk samarbejde mellem EUROGROUP lande.
Bilag: »EUROLOG Handbook of Basic Texts on Collaborative
Support«.
1. I overensstemmelse med EUROGROUP's deklaration om
logistisk samarbejde af 7 maj 1975 (bilag side 3) publiceres herved
"EUROLOG Handbook of Basic Texts on collaborative Support".
2. Ved udarbejdelse af bi- eller multilaterale
materielmæssige samarbejdsaftaler mellem danske og øvrige EUROGROUP nationers
myndigheder skal de i bilaget omhandlede principper og procedurer i videst
muligt omfang søges efterlevet.
EB
I.B.RODHOLM
kontreadmiral
chef for Materielstaben
CONTENTS
Fordeling: Standardfordeling.
BILAG: Page
Foreword 1
Declaration on Eurogroup Principles of Co-operation
in Logistics 3
Guidelines for Collaboration in Logistic Follow-on-
Support for Major Weapons/Equipment to be introduced
in Eurogroup Countries 7
Practical Procedures for Development of Collaborative
Follow-on Logistic Support for New Common Equipments 13
FOREWORD BY THE CHAIRMAN OF EUROLOG
EUROLOG (* 1) has been working for some years on devising arrangements to
ensure that opportunities for co-ordinated logistic support of collaborative
equipment projects are not prejudiced through decisions taken early in the
Læs alt
life of a project. Now that the three main documents involved are in final
form and have been agreed or endorsed as appropriate by Eurogroup Ministers,
it is timely to publish them together in this booklet, together with an
explanation of their usefulness, not only to logistic staffs, but also to
those working in the field of procurement who might be asked to respond to
requests for assistance from logisticians.
The management of international weapons projects is far from simple. The
factors underlying decisions increase in proportion to the number of
countries. Worse, countries may join or leave at different stages. The result
is that such weapons projects often have at their foundations a complex web
of agreements and understandings between countries, agencies, consortia and
firms. During this early and crucial stage it is unlikely that much thought
will have been given to the logistic support of the weapon - after all, the
procurement staffs are quite rightly giving all their attention to ensuring
that the Armed Forces receive the desired equipment at the right time.
The eventual equipment has, however, to be supported by logisticians for
perhaps twenty years and the cost of this in-service phase can be of the same
order as the initial outlay.
Unfortunately, it is often the case that the very practical and necessary
decisions reached by procurement authorities mean that it is difficult,
sometimes impossible, to set up rational, cooperative logistic support and
thereby reap the benfits - economy, standardisation, flexibility - that were
supposed to flow from the collaboration.
With this in mind EUROLOG formulated Principles of Co-operation in
Logistics which picked up a theme from EURONAD's Principles of Equipment
Collaboration that co-ordinated logistics should be automatically considered
as part of any collaborative project. In London on 7 May 1975 EUROGROUP
Ministers signed a Declaration (reproduced in this booklet) adopting the
Logistics Principles.
It remained to ensure that the Principles were translated into practice.
EUROLOG therefore drew up Guidelines which gave more specific direction as to
how co-operative logistic support of collaborative weapons should be pursued.
This document too was approved by EUROGROUP Ministers.
The task now fell on EUROLOG and its sub-groups to monitor the
implementation of the Principles and Guidelines. To give national logistics
staffs some guidance as to what logistics considerations should be taken into
account at the various stages of a project, a Procedure was drawn up, based
on the phases as defined in the NATO Periodic Armaments Planning System. This
Procedure should encourage uniformity of practice between the EUROGROUP
countries. It is not designed for literal application in every country,
because of differing administrative structures and practices but is intended
as a model which countries should strive to translate into their own context
through appropriate adjustments.
The successful application of these three documents rest on close liaison
between logistics and procurement staffs. In some countries this is
accomplished automatically through integration of the two functions. In
others there is a difficult gap to bridge. Recognizing the problem of those
logistics staffs who do not have automatic access to procurement staffs,
Ministers acknowledged (EG/27/80 (Final)) in 1980 »that national members
of EUROLOG Sub-Groups were exercising their monitoring responsibilities in
regard to arrangements for follow-on logistic support of collaborative
weapons projects on behalf of EUROGROUP Ministers and with authority derived
from them«.
I hope that this booklet, which brings into one volume the fruits of five
years work by EUROLOG, will be of assistance (and perhaps also an
inspiration) to procurement and logistics staff, national and international.
Air Vice Marshal J J Miller
Assistant Chief of the Defence Staff (Personnel and Logistics)
MOD United Kingdom
Chairman, EUROLOG
DECLARATION ON EUROGROUP PRINCIPLES OF CO-OPERATION IN LOGISTICS
The Ministers of Defence of Belgium, Denmark, the Federal Republic of
Germany, Greece, Italy, Luxembourg, the Netherlands, Norway, Turkey and the
United Kingdom:
Desiring to achieve a greater measure of collaboration in logistic support
among European member states of the North Atlantic Alliance;
Anxious to make optimum use of their logistic resources;
on 7 May 1975 adopted the Principles of Co-operation in Logistics set out
in the Annex herewith as a basis for common action.
Ministers confirm their understanding that each will:
- Act in compliance with these principles;
- Disseminate them within his national Defence Ministry;
- Instruct all those of his staffs who have responsibility for logistics
to act in accordance with these principles.
PAUL VANDEN BOEYNANTS
Minister of National Defence
Belgium
EMILE KRIEPS
Minister of Defence
Luxembourg
ORLA MØLLER
Minister of Defence
Denmark
HENK VREDELING
Minister of Defence
The Netherlands
GEORG LEBER
Minister of Defence
Federal Republic of Germany
ALV JAKOB FOSTERVOLL
Minister of Defence
Norway
BYRON THEODOROPOULOS
Permanent Representative to NATO
acting for the
Minister of National Defence
Greece
FERIT MELEN
Minister of National Defence
Turkey
ARNALDO FORLANI
Minister of Defence
Italy
ROY MASON
Secretaty of State for Defence
United Kingdom
London 7 May 1975
ANNEX
EUROLOG PRINCIPLES OF CO-OPERATION IN LOGISTICS
I OBJECTIVES
1. One of the important overall objectives of the
Eurogroup is to increase co-operation in defence among member nations. The
field of logistics is one in which there is scope for improvements of this
kind. Although the provision of logistic support for NATO-assigned forces is
at present a national responsibility, closer collaboration in logistic
support will enable member countries whose forces are deployed in the same
area with similar or complementary operational responsibilities to make more
efficient and economical use of their logistic resources.
2. The ultimate objective is to achieve the closest
possible integration of logistics systems among Eurogroup members in respect
of the forces they assign to NATO. This is, however, dependent on fundamental
changes in the arrangements for financing those logistics systems and for the
procurement of equipment; and also on the achievement of much greater
standardization of weapons and equipment than exists at present. In the
meantime, worthwhile progress towards the objective can be made by developing
co- operative logistic arrangements and co-ordinated procedures wherever the
opportunity exists and greater efficiency and cost-effectiveness would
result.
II PRINCIPLES
3. The following principles have been drawn up to
provide a basis for co-operation in the field of logistic support:.
a. New Collaborative Projects for Weapons Systems and Major Equipments.
Practical possibilities of collaboration in support of weapons systems and
major equipments (egg, maintenance, repair and spares provisioning) are
limited by the differences between weapons and equipments at present used by
the member countries. A major effort is now being made by Eurogroup contries
through the work of EURONAD to promote standardization of new weapons and
equipment by means of collaborative projects. Member countries have already
agreed in the Principles of Equipment Collaboration that the requirement to
attempt to evolve co-ordinated arrangements for follow-on support be an
automatic accompaniment of any collaborative procurement project. EUROLOG
will work with the relevant agencies to satisfy themselves that appropriate
arrangements are being made in each case.
b. Other New Equipment Projects . Member countries agree that a similar
effort to evolve co-ordinated arrangements for follow-on support should be
made when any new weapon or equipment is under consideration or adopted by
two or more countries, whether or not the particular item is categorized as a
collaborative procurement project.
c. Existing Weapons or Equipments. Member countries agree that
consideration should be given to the possibility of co-operation in the
logistic support of existing weapons and equipments used by more than one
country which are not already the subject of co-operative arrangements.
d. Harmonization of Logistic Procedures. Member countries agree that every
effort will be made to harmonize/standardize logistic procedures with the
object of achieving increased flexibility in logistic support.
e. Future Logistic Planning. Member countries agree that they should
exchange information regularly about logistics, including information on
planned logistic projects, with the general aim of enabling others to join in
such projects if this would be of advantage. They agree also that there
should be a regular exchange of information on the evaluation of national
logistic concepts.
III METHOD OF IMPLEMENTATION
4. Responsibility for implementation of these
principles lies with Eurogroup countries, under the directiom of Eurogroup
Ministers. The sub-group established in the field of logistics (EUROLOG) has
so far devoted its main efforts to examining the possibilities of logistics
co-operation between the land forces in the Northern Army Group, between the
air forces in the Second Allied Tactical Air Force and between the navies
which operate in the Channel and the North Sea. The countries providing these
forces are at present represented on EUROLOG. It is open to other Eurogroup
countries to join EUROLOG when subjects of interest to them are under
consideration.
GUIDELINES POR COLLABORATION IN LOGISTIC FOLLOW-ON SUPPORT FOR MAJOR
WEAPONS/EQUIPMENT TO BE INTRODUCED IN EUROGROUP COUNTRIES
1. INTRODUCTION
The logistics required for the efficient and economical support of a new
weapon or major equipment, being introduced into the forces of two or more of
the EUROGROUP countries under collaborative or other arrangements, are
dependent upon such a wide range of factors that it is not possible to lay
down detailed procedures for universal application. Some guidelines for the
development of logistic support for such projects can be laid down, however,
providing it is accepted that the final arrangements are likely to vary in
each case. This memorandum has therefore been prepared by EUROLOG to provide
general guidance to nations considering the logistic support needed for
common weapon systems or major equipment to be used by two or more of the
EUROGROUP countries.
2. AIM
It is of the first importance to increase substantially the extent and
depth of the follow-on support of the defence equipment of the participating
countries. The aim of these guidelines is to ensure the adoption of a
consultative process among the EUROGROUP countries which lead to their
improved collaboration, with particular reference to the avoidance of
wasteful duplication among the participating countries in this area and the
realisation of both the economic and military benefits of enhanced
standardisation. The guidelines are in this respect an extension and
implementation of the approved »Principles of Co-operation in
Logistics«
3. GENERAL GUIDELINES
a. The prime object of the participating nations should be to establish
collaborative arrangements for the follow-on support of any collaborative or
other new weapon/equipment project, as already agreed by EUROGROUP nations in
paragraph 9 of the »Principles of Equipment Collaboration«. This
follow-on support should include, wherever possible, a most thorough
examination of all options for collaboration both in the procurement, holding
and distribution of spares and the provision of maintenance facilities (ie
servicing, repair and test facilities). A basic and substantial requirement
for any area of joint follow-on support is the commitment of all
participating countries to maintain wherever possible a uniform configuration
of the supported equipment.
b. The preparation of follow-on logistic arrangements should normally be
undertaken by logisticians of the participating nations, who should consult
other appropriate staff or agencies as necessary. Common NATO guidelines,
procedures and methods already in existence or being developed should be
taken into consideration.
c. NAMSA was set up by the NATO nations to provide logistic support
facilities for common weapons and equipment where this could be undertaken
more effectively and economically than could be achived individually by
participating nations. Thus consideration should always be given, as an
initial option, to the possibility of using the Agency for the logistic
support task. If the participating nations decide to offer a task to NAMSA
the normal procedure is to request NAMSO (through the Board of Directors) to
initiate a feasibility study prior to either the formation of a Weapons
System Partnership (WSP) or alternatively, the establishment of a programme.
The undermentioned guidelines would also apply in the case of a WSP
agreement.
4. EUROLOG INVESTIGATIONS
The investigation of major weapon systems and projects due to enter
service in the years ahead and the comprehensive joint examination of
national plans in these fields are essential to ensure that all worhtwhile
opportunities for collaboration are taken up. To this end EUROLOG will be
assembling lists of new weapon systems to be introduced in the Services of
the EUROGROUP countries. These lists will be kept under review periodically.
They will be updated by countries end examined jointly at least once a year.
5. GUIDELINES ON LOGISTICS ASPECTS
a. Co-ordination and Direction by participating Nations
(1) If appropriate a Joint Steering Committee, as a body of senior
representatives of the participating countries, should be established to
identify at an early stage in the life of a project possible areas for joint
logistic support and to co-ordinate logistics with eg training, procurement
or post-development.
(2) A Joint Working Group, composed of logistics experts and subordinate
to any Joint Steering Committee, should be set up to examine in detail the
possible areas, extent and types of logistic co-operation, to sponsor and
evaluate any feasibility studies and, subsequently, to implement the
agreement reached for logistics support.
b. Documentation. A formal document (ie Memorandum of Understanding or WSP
agreement) should be drawn up describing and defining the co-ordinated
logistic support arrangements mutually agreed by the participants.
c. Material Requirements. The main object of co-ordinating the material
requirements for follow-on logistic support is to achieve the cost benefits
which can normally be expected from larger purchases (ie economies of scale)
and limiting overall stocks to the minimum by pooling stockholdings wherever
possible. Among the factors to be considered are:
(1) Allocation of responsibility for the procurement of materials,
spares, etc (ie to a NATO Agency or to one of the participants);
(2) A facility to ensure that modification programmes are fully agreed
and co-ordinated by all participant nations so as to maintain a common
configuration and the ability to interchange main equipments, sub-assemblies
and modules between national weapon systems;
(3) Assessment of the range of materials, spares etc required to support
the weapon or major equipment concerned at user, maintenance and supply
levels;
(4) Naming, identification, classification and numbering in the NATO
Codification System of equipments, spares, tools and accessories to be held
at every level and/or by each participant;
(5) Identification of the size, location, funding and custodian of the
common pool of materials, spares, etc;
(6) The need for an agreed priority system for each participant's
requirements and arrangements for exceptional requirements (eg for combat
operational requirements and non-scaled items);
(7) Procedures for distribution of supplies, including timescales for
requisition and delivery, methods of handling, transportation and freight,
special cases for security and other special requirements;
(8) Planning of follow-on support arrangements and the method of
forecasting future requirements, including periodicity of replenishment
demands and identification of individual items;
(9) Identification of management and supply information needs and a
system for providing and updating them; (eg Data Collection Programme -
Evaluation of Unsatisfactory Equipment Reports (UER) - Evaluation of
Unsatisfactory Improvement Reports (UIR));
(10) Exchange of management and supply information and of engineering
information affecting supply;
(11) Disposal of excess or obsolete stocks;
(12) Accounting procedures;
(13) Required testing equipment, inspection facilities and tools;
(14) Drawing up of a calibration concept, including joint use of
facilities;
(15) Demands on preservation and packaging procedures including the
examination of the necessity and the scope of re-usable containers;
(16) Achieving a concept for the disposition and supervision of a
stockpile circuit for interchangeable articles;
(17) Determination of value standards (especially a definition of high
value items).
d. Maintenance, Overhaul and Repair. The main object is to establish
common or compatible maintenance policies so that engineering support
facilities can be fully utilised. Among the factors to be considered are;
(1) The definition of tasks to be undertaken and their division between
central (ie provided by a manufacturer, an agency or one of the participants)
and national resources;
(2) Provision of common technical publications, record of approved and/or
incorporated modifications, and other supporting documentation;
(3) Estimates of consumption of spares for individual maintenance,
overhaul and repair tasks;
(4) Provision of spare parts to support repair lines;
(5) Estimates of costs of maintenance, overhaul and repair;
(6) Training requirements in respect of maintenance, overhaul and repair;
(7) Provision of special tools and equipment;
(8) Exchange of information, including systems effectiveness, defects,
modifications and improvements.
e. Inter-changeability. In cases where a uniform configuration cannot be
obtained or maintained the participants should agree to the
interchangeability of assemblies and other component parts, wherever
practicable, so as to maximise cross servicing capabilities and minimise the
range of spares to be held centrally.
f. Quality Assurance. The participants should agree on the level and
extent of quality assurance to be adopted for:
(1) Equipment, spares, tools and accessories provided for the first fits
and for common and national stocks; and
(2) maintenance, overhaul and repair tasks.
g. Finance. Where support is carried out by NAMSA or another NATO agency
the normal arrangements for financing programmes undertaken by that Agency
will be followed. In other cases it will be necessary for the participating
countries to agree appropriate arrangements for cost sharing.
6. GENERAL
EUROLOG is responsible to the EUROGROUP Ministers for monitoring proposed
follow-on logistic arrangements for common weapon systems and major
equipments to ensure satisfactory arrangements are being made in each case.
These guidelines together with the Statement of Principles of Co-operation in
Logistics form a basis for such monitoring and consequent reports to
EUROGROUP.
PRACTICAL PROCEDURE FOR DEVELOPMENT OF COLLABORATIVE FOLLOW-ON LOGISTIC
SUPPORT FOR NEW COMMON EQUIPMENTS
1. This procedure is for use by national consumer
logistic planning staff when considering the follow-on logistic support
needed for common weapons systems or major equipments after they enter
service.
2. Its purpose is to enable consumer logistic planning
staffs to comply with the EUROGROUP Principles of Co-operation in Logistics
by ensuring that all options for collaboration between participating nations
on follow-on support arrangements are fully considered during the early
phases of a collaborative project.
3. All EUROGROUP nations have signed the Declaration
of Principles on Co-operation in Logistics and EUROLOG nations have issued
instructions within their own Ministries which require operational
requirement staff and production authorities to advise the appropriate
consumer logistic planning staff as soon as it is decided that new or
replacement equipment will be developed as a collaborative project and to
liaise with them in the development of collaborative follow-on support
arrangements through of the equipment development.
4. It is envisaged that the consumer logistic staff
will need to be involved from the beginning of the Pre-Concept/Staff Target
Development Phase through to the Acquisition/Procurement Phase. This
procedure does not extend to the In Service Phase, since it is assumed that
logistic support planning will by then be largely completed and subject to
normal management action. The checks to be made at each phase are set out
below.
5. Staff Target Development Phase
a. Receive notification from Operational Requirements Staff or production
authorities that the weapon or equipment is likely to be the subject of a
collaborative project.
b. Ascertain
(1) which countries are likely to participate in the project;
(2) whether there is any information as to the likely extent of
collaboration on production eg will the weapon be procured from a single
source or be the subject of co-production arrangements?
c. Consider to the extent possible at this stage the type and probable
extent of logistic support required and whether any special storage or
maintenance facilities are likely to be required.
d. Consider whether there are any existing collaborative support
arrangements in force for the weapon being replaced or for similar weapons in
use by the participating nations and whether these could form the basis for
the planning of collaborative support for the new weapon.
e. Consider to the extent possible at this stage whether NAMSA might be
able to provide support facilities and, if not, whether responsibility for
certain aspects of support eg configuration control, procurement of
materials, maintenance etc could be allocated to one of the participants.
f. If a MOU is to be drafted at this stage endeavour to ensure that it is
worded so as not to close any options for later collaboration on follow-on
support and, that, if possible, it includes some undertaking to require
participants to consider prospects for collaborative support during the Staff
Requirement Development Phase.
g. Advise the Operational Requirements Staff or Production authorities
involved of any views which have been formed about prospects for
collaborative support in the light of the above preliminary analysis.
6. Staff Reguirement Development Phase
a. Receive copy of Draft Staff Target and any MOU which may have been
signed during the Staff Target Development Phase.
b. If not already done, establish liaison with the national member of the
Project Group for the equipment concerned.
c. Consider whether and when it would be appropriate to set up a Joint
Steering Committee (para 5a of EUROLOG Guidelimes) and make recommendations
accordingly to the Project Group.
d. Receive copies of the initial draft of systems specifications and
ensure that the views of consumer logistic authorities on design features
which will affect follow-on support arrangements eg reliability and
maintainability, are taken into account in the drafting of these
specifications.
e. If it is decided to negotiate co-production, or licensing agreements
during this phase endeavour to ensure that no options for the development of
collaborative support are closed; this includes assessing what negotiations
are required over intellectual property rights.
f. Commence planning for standardization of maintenance and supply support
in accordance with para 5c, d and e of the EUROLOG guidelines.
g. Endeavour to ensure that follow-on support arrangements, particularly
procurement storage and distribution of spares, arrangements for maintenance
and repair and configuration control, are included in any MOU for the system
development phase which may be drafted at this stage.
7. System Development Phase
a. Receive copy of the agreed Staff Requirement and any further MOU which
may have been signed during the Staff Requirement Development Phase.
b. If not already set up under 5c above, consider whether a Joint Steering
Committee or Joint Working Group should be set up to examine in detail the
possible areas, extent and types of logistic co-operation (para 5a of EUROLOG
Guidelines).
c. Give support to the setting up by the project management authority of a
joint common configuration management system which would help to maximise the
benefit to be obtained from collaborative support arrangements.
d. Continue the consideration and development of options for collaborative
support on which action was started under the previous phase in accordance
with para 5 of the EUROLOG Guidelines and in particular consider
(1) Allocation of responsibility for procurement of materials.
(2) Estblishing common or compatible maintenance policies,
(3) The possibility of setting up common calibration, maintenance or
repair facilities.
using the facilities of NAMSA or one of the participants.
8. Acquisition/Procurement Phase
a. Finalise planning for logistic follow-on support and draw up an MOU or
other formal document defining the co-ordinated logistic support arrangements
mutually agreed.
b. Complete and implement the logistic plan prior to start of In- Service
Phase.
Officielle noter
(* 1) EUROLOG, a specialist subgroup of Eurogroup, has the following
membership: Belgium, Denmark, Federal Republic of Germany, Greece, Italy,
Netherlands, Norway, Portugal, Turkey, United Kingdom.
Lignende dokumenter
- FORSVARSKOMMANDOBESTEMMELSE M.670-1 om bestemmelser for forsvarets sanitetsmaterieludvalg. Retsinformation · 25. september 1997
- FORSVARSKOMMANDOBESTEMMELSE M.607-4 om bestemmelser vedrørende medicinanskaffelser til forsvaret. Retsinformation · 25. september 1997
- Afgørelse — Københavns Kommune Huslejenævnene · 28. august 2023
- FORSVARSKOMMANDOBESTEMMELSE M.212-3 om administrativt direktiv for forsvarets deltagelse i NATO standardiseringsarbejde med tilknytning til Military Agency for Standardization (MAS). Retsinformation · 25. september 1997
- RÅDETS AFGØRELSE af 22. marts 2007 om indgåelse af en aftale i form af brevveksling til bekræftelse af den fælles forståelse om fornyelse og ændring af aftalen om internationalt forsknings- og udviklingssamarbejde inden for intelligente fremstillingssystemer (IMS) mellem Det Europæiske Fællesskab og Australien, Canada, EFTA-landene Norge og Schweiz, Korea, Japan og Amerikas Forenede Stater (2008/148/EF) AFTALE i form af brevveksling til bekræftelse af den fælles forståelse om fornyelse og ændring af aftalen om internationalt forsknings- og udviklingssamarbejde inden for intelligente fremstillingssystemer (IMS) mellem Det Europæiske Fællesskab og Australien, Canada, EFTA-landene Norge og Schweiz, Korea, Japan og Amerikas Forenede Stater EU-lovgivning · 22. marts 2007
- Ligebehandlingsnævnets afgørelse om handicap - rimelig tilpasning - chikane - uanset handicap - afvisning Retsinformation · 5. september 2026