Judgment of the General Court (Fourth Chamber) of 25 November 2026. — Scandlines Danmark ApS and Others v European Commission.
Læs kilden ved EU-domme (åbner i ny fane)
Teksten
JUDGMENT OF THE GENERAL COURT (Fourth Chamber)
25 November 2026 (*)
( State aid – Transport – Aid in favour of the Øresund fixed rail-road link – Public financing granted by the Kingdom of Denmark and the Kingdom of Sweden to the fixed link infrastructure project – State guarantees – Decision finding existing aid – Individual aid – Date of award – Action for annulment – Substantial direct and individual effect on competitive position – Interest in bringing proceedings – Admissibility )
In Case T-258/24,
Scandlines Danmark ApS, established in Copenhagen (Denmark),
Scandlines Deutschland GmbH, established in Hamburg (Germany),
Stena Line Scandinavia AB, established in Gothenburg (Sweden),
Rederi Aktiebolaget Nordö-Link, established in Malmö (Sweden),
represented by L. Sandberg-Mørch, lawyer,
applicants,
v
European Commission, represented by M. Farley, C. Kovács and M. Lagrue, acting as Agents,
defendant,
supported by
Kingdom of Denmark, represented by C. Maertens, acting as Agent, and by R. Holdgaard, lawyer,
and by
Kingdom of Sweden, represented by H. Eklinder, acting as Agent,
interveners,
THE GENERAL COURT (Fourth Chamber),
composed of G. De Baere, President, R. Meyer (Rapporteur) and D. Jočienė, Judges,
Registrar: A. Marghelis, Administrator,
having regard to the written part of the procedure,
further to the hearing on 4 March 2026,
gives the following
Judgment
1By their action under Article 263 TFEU, the applicants, Scandlines Danmark ApS and Scandlines Deutschland GmbH (together, ‘Scandlines’), Stena Line Scandinavia AB (‘Stena’) and Rederi Aktiebolaget Nordö Link (‘Nordö-Link’), seek the partial annulment of Commission Decision (EU) 2024/2467 of 13 February 2024 on the measures State aid SA.52162 (2019/C) (ex 2018/FC) – Denmark and State aid SA.52617 (2019/C) (ex 2018/FC) – Sweden implemented by Denmark and Sweden for Øresundsbro Konsortiet (OJ L, 2024/2467), by which the European Commission considered inter alia that the State guarantee model granted by the Kingdom of Denmark and the Kingdom of Sweden for the purpose of financing the planning and construction of a fixed link across the Øresund (‘the measure at issue’) constituted aid, within the meaning of Article 107(1) TFEU, that that aid should be classified as existing aid and that it was therefore not subject to recovery (‘the contested decision’).
Background to the dispute
2On 23 March 1991, the Kingdom of Denmark and the Kingdom of Sweden concluded the Treaty concerning a fixed link across the Øresund, signed in Copenhagen (‘the intergovernmental agreement’), by which they agreed jointly to plan, construct and operate a fixed link across the Øresund (‘the fixed link’). That link consists of a 16-kilometre (km)-long bridge for road and rail traffic between the Swedish coast (near Malmö) and the artificial island of Peberholm (Denmark) and an immersed road and rail traffic tunnel between Peberholm and the Danish coast (near Kastrup). To that end, they established Øresundsbro Konsortiet (‘the consortium’), which they jointly own. The project was one of the trans-European networks in transport (TEN-T) priority projects, approved by the European Council in 1994.
3Between 1995 and 2000, the consortium planned and constructed the fixed link, and started operating it in July 2000.
4In accordance with the intergovernmental agreement, the consortium is financed through tolls paid by users for the use of the road and charges for the use of the railway line. The intergovernmental agreement also provided for a State guarantee granted by the Kingdom of Denmark and the Kingdom of Sweden to the consortium for the loans and financial instruments taken out by the consortium in order to finance the fixed link. Lastly, the project also received a grant from the European Union under the Trans-European Transport Network (TEN-T).
5The applicants are shipping companies which operate ferry routes in the Baltic Sea.
6Taking the view that it was in competition with the consortium, Scandlines Øresund IS, which was then owned by Stena and Scandlines and which would subsequently become HH Ferries, and then ForSea, lodged a complaint with the Commission on 16 April 2013. It claimed that the State guarantees granted by the Kingdom of Denmark and the Kingdom of Sweden in respect of the fixed link constituted State aid that was unlawful and incompatible with the internal market.
7On 15 October 2014, the Commission adopted a decision in which, inter alia, it did not raise any objections to the guarantee granted to the consortium by the Kingdom of Denmark on the ground that that State aid, within the meaning of Article 107(1) TFEU, was compatible with the internal market under Article 107(3)(b) TFEU. It also considered that the guarantee granted to the consortium by the Kingdom of Sweden constituted existing aid within the meaning of Article 1(b)(i) of Council Regulation (EC) No 659/1999 of 22 March 1999 laying down detailed rules for the application of Article 93 of the EC Treaty [now Article 108 TFEU] (OJ 1999 L 83, p. 1) and Article 144 of the Act concerning the conditions of accession of the Kingdom of Norway, the Republic of Austria, the Republic of Finland and the Kingdom of Sweden and the adjustments to the Treaties on which the European Union is founded (OJ 1994 C 241, p. 9), in relation to which there was no reason to initiate the procedure to propose appropriate measures regarding existing aid schemes.
8In addition, the Commission concluded that the Kingdom of Denmark and the Kingdom of Sweden, as well as the consortium, could have a legitimate expectation that the Commission would not call into question the State guarantees on the basis of the applicable State aid rules. That conclusion was based, inter alia, on the Commission’s general policy not to call into question financing measures for the construction and operation of infrastructure definitively adopted before the judgment of 12 December 2000, Aéroports de Paris v Commission (T-128/98, EU:T:2000:290).
9By judgment of 19 September 2018, HH Ferries and Others v Commission (T-68/15, EU:T:2018:563), the Court annulled in part the Commission’s decision of 15 October 2014 referred to in paragraph 7 above, in so far as the Commission had decided, inter alia, not to raise any objection with respect to the State guarantees granted to the consortium by the Kingdom of Denmark and the Kingdom of Sweden.
10Subsequently, the Commission adopted a decision to initiate the formal investigation procedure provided for in Article 108(2) TFEU in respect of, inter alia, the State guarantees granted by the Kingdom of Denmark and the Kingdom of Sweden to the consortium for the loans and financial instruments taken out by the consortium in order to finance the fixed link. Following that decision, two invitations to submit comments were published in the Official Journal of the European Union on 22 March 2019 (OJ 2019 C 109, p. 46 and p. 72).
11At the end of the formal investigation procedure referred to in paragraph 10 above, the Commission adopted the contested decision. By that decision, it concluded, inter alia, that the measure at issue constituted State aid, within the meaning of Article 107(1) TFEU, to a single beneficiary, namely the consortium. The Commission added that that aid constituted individual ad hoc aid granted on 13 February 1992, the date on which the consortium had been established, and that it should therefore be regarded as existing aid, within the meaning of Regulation No 659/1999, which could not be recovered. Lastly, it stated that the two Member States concerned had undertaken to ensure that the consortium would finance its new debts and refinance its existing debt on market terms. It inferred from this that the aid at issue would be phased out as the outstanding debt instruments expired.
Forms of order sought
12The applicants claim, in essence, that the Court should:
– annul Article 2 of the contested decision in so far as it finds that the measure at issue constitutes existing aid and recital 371 of that decision in so far as it finds that no operating aid was granted to the consortium;
– order the Commission to pay the costs.
13The Commission contends that the Court should:
– dismiss the action;
– order the applicants to pay the costs.
14The Kingdom of Denmark and the Kingdom of Sweden contend that the Court should dismiss the action.
Law
15In support of their action, the applicants raise two pleas in law.
16The first plea alleges, in essence, that the Commission incorrectly classified the measure at issue as one single individual aid instead of considering that new aid is granted each time a financial transaction entered into by the consortium is guaranteed.
17The second plea alleges, in essence, that the Commission made a manifest error of assessment in concluding that the aid granted to the consortium for the financing of the planning and construction of the fixed link did not include operating aid.
18The Commission, supported by the Kingdom of Denmark and the Kingdom of Sweden, raises a plea of inadmissibility alleging that the applicants lack standing to bring proceedings. The Kingdom of Denmark has also called into question the applicants’ interest in bringing proceedings.
19It is therefore appropriate to consider the admissibility of the present action before examining the substantive pleas raised.
Admissibility
20The applicants submit that their action is admissible. Although they are not addressees of the contested decision, they consider that it is of direct and individual concern to them. They also claim that they have an interest in the annulment of that decision.
21The Commission contends that the applicants’ action is inadmissible.
22The admissibility of an action brought by natural or legal persons against an act which is not addressed to them, in accordance with the fourth paragraph of Article 263 TFEU, is subject to the condition that they be accorded standing to bring proceedings, which arises in two situations. First, such proceedings may be instituted if the act is of direct and individual concern to those persons. Second, such persons may bring proceedings against a regulatory act not entailing implementing measures if that act is of direct concern to them (see, to that effect, judgments of 17 September 2015, Mory and Others v Commission, C-33/14 P, EU:C:2015:609, paragraphs 59 and 91, and of 15 July 2021, Deutsche Lufthansa v Commission, C-453/19 P, EU:C:2021:608, paragraph 31).
23The decision at issue addressed to the Kingdom of Denmark and the Kingdom of Sweden – which, it is not disputed, does not relate to a State aid scheme – does not constitute a regulatory act under the fourth paragraph of Article 263 TFEU as it is not an act of general application (see, to that effect, judgment of 15 July 2021, Deutsche Lufthansa v Commission, C-453/19 P, EU:C:2021:608, paragraph 32).
24It is therefore necessary to determine, initially, whether the applicants can claim standing to bring an action for annulment of the contested decision, by examining, first, whether they are individually concerned and, second, whether they are directly concerned, before then going to on to determine whether they can claim an interest in bringing an action for annulment of that decision. In that regard, it is necessary to consider, first of all, Scandlines’ and Stena’s standing to bring proceedings and their interest in bringing proceedings, in their capacity as owners of Scandlines Øresund.
Standing to bring proceedings
– Individual concern
25Scandlines and Stena state that, between 1997 and 31 December 2014, they each owned 50% of Scandlines Øresund. That joint venture operated a ferry service providing a shipping route in the Øresund, between the city of Helsingør (Denmark) and the city of Helsingborg (Sweden), approximately 65 km from the fixed link. Scandlines and Stena therefore consider that they were in competition with the fixed link.
26Scandlines and Stena claim, in essence, that Scandlines Øresund’s position on the market was substantially affected by the measure at issue. First, they submit that the market share of that joint venture has declined since the fixed link opened. In their capacity as owners of Scandlines Øresund, they thus incurred a decline in turnover of approximately 25% over a 5- to 10-year period. That is due, in particular, to the fact that the fixed link reduced transport prices by 40 to 50%, which thus put pressure on competing undertakings. Second, Scandlines and Stena claim to have ‘lost out on [the] opportunity’ to make profits in their capacity as owners of Scandlines Øresund, since it was impossible for Scandlines Øresund to attract the newly created traffic.
27Scandlines and Stena also state that the Commission itself concluded, in particular in the contested decision, that Scandlines Øresund was in a competitive relationship with the fixed link and that its position on the market was significantly adversely affected by the measures forming the subject matter of that decision.
28The Commission contends that, in order to prove their individual concern, the applicants must not only demonstrate the existence of a competitive relationship and the fact that the measure at issue may exert an influence on that competitive relationship in the relevant market, but must also adduce evidence that that measure is liable to have a substantial adverse effect on their position on that market. In order to do so, the applicants must demonstrate the existence of a causal link between the measure at issue and the evidence put forward to establish the existence of an adverse effect on their position on that market.
29In the present case, the Commission contends that neither Stena nor Scandlines supported their assertions with evidence. Thus, their claims that Scandlines Øresund, which they owned, suffered a decline in its market share are not supported by evidence. The applicants put forward figures without providing a source for them, or figures based on documents which are too old to establish a causal link between the loss of customers and the creation of the fixed link. The Commission also disputes the existence of a pricing strategy on the part of the consortium.
30It should be borne in mind that persons other than those to whom a decision is addressed may claim to be individually concerned only if that decision affects them by reason of certain attributes which are peculiar to them or by reason of circumstances in which they are differentiated from all other persons and, by virtue of those factors, distinguishes them individually just as in the case of the person addressed (see, to that effect, judgments of 15 July 1963, Plaumann v Commission, 25/62, EU:C:1963:17, p. 107; of 17 September 2015, Mory and Others v Commission, C-33/14 P, EU:C:2015:609, paragraph 93; and of 15 July 2021, Deutsche Lufthansa v Commission, C-453/19 P, EU:C:2021:608, paragraph 33).
31Where an applicant calls into question the merits of the decision appraising the aid taken on the basis of Article 108(3) TFEU or after the formal investigation procedure, it must then demonstrate that it has a particular status for the purposes of the case-law referred to in the previous paragraph. That applies in particular where the applicant’s position on the market concerned is substantially affected by the aid to which the decision at issue relates (judgments of 17 September 2015, Mory and Others v Commission, C-33/14 P, EU:C:2015:609, paragraph 97, and of 15 July 2021, Deutsche Lufthansa v Commission, C-453/19 P, EU:C:2021:608, paragraph 37).
32In that regard, the Court of Justice has repeatedly held that the demonstration by the applicant of a substantial adverse effect on its market position does not entail a definitive ruling on the competitive relationship between that party and the undertakings in receipt of aid. That party is required only to adduce pertinent reasons to show that the Commission’s decision may adversely affect its legitimate interests by substantially affecting its position on the market in question (see, to that effect, judgments of 28 January 1986, Cofaz and Others v Commission, 169/84, EU:C:1986:42, paragraph 28; of 22 November 2007, Sniace v Commission, C-260/05 P, EU:C:2007:700, paragraph 60; and of 15 July 2021, Deutsche Lufthansa v Commission, C-453/19 P, EU:C:2021:608, paragraph 57).
33Thus, as noted by Stena and Scandlines, the substantial adverse effect on an applicant’s competitive position on the market in question results not from a detailed analysis of the various competitive relationships on that market, allowing the extent of the adverse effect on its competitive position to be established specifically, but, in principle, from a prima facie finding that the grant of the measure covered by the Commission’s decision leads to a substantial adverse effect on that position. It follows that that condition may be satisfied where the applicant adduces evidence to show that the measure at issue is liable to have a substantial adverse effect on its position on the market concerned (see judgment of 15 July 2021, Deutsche Lufthansa v Commission, C-453/19 P, EU:C:2021:608, paragraphs 58 and 59 and the case-law cited).
34In that regard, the mere fact that an act may exercise an influence on the competitive relationships existing on the relevant market and that the undertaking concerned is in a competitive relationship with the beneficiary of that act cannot suffice for that undertaking to be regarded as being individually concerned by that act. Therefore, an undertaking cannot rely solely on its status as a competitor of the undertaking in receipt of aid for the purpose of establishing a substantial adverse effect on its position on the market (see judgment of 15 July 2021, Deutsche Lufthansa v Commission, C-453/19 P, EU:C:2021:608, paragraph 60 and the case-law cited).
35A substantial adverse effect on a position on the market can be demonstrated by the existence of certain factors indicating a decline in the applicant’s commercial or financial performance, such as a significant decline in turnover, appreciable financial losses or a significant reduction in market share following the grant of the aid in question. However, the grant of State aid can also have an adverse effect on the competitive situation of an operator in other ways, in particular by causing the loss of an opportunity to make a profit or a less favourable development than would have been the case without such aid (see, to that effect, judgment of 15 July 2021, Deutsche Lufthansa v Commission, C-453/19 P, EU:C:2021:608, paragraph 61 and the case-law cited).
36It should also be noted, as the main parties have done, that even active participation in the administrative phase of the procedure which led to the adoption of the contested decision is not sufficient, in itself, to render admissible an action challenging the merits of that decision. However, such participation may be an indication that the applicants are individually concerned by the decision (see, to that effect, judgment of 22 November 2007, Sniace v Commission, C-260/05 P, EU:C:2007:700, paragraph 55 and the case-law cited).
37In the present case, it is apparent in particular from Annex A.13 to the application that Stena and Scandlines, in their capacity as owners of Scandlines Øresund, played an active role in the administrative phase of the procedure as early as 2013, the year in which they lodged a complaint with the Commission.
38Moreover, there is little doubt that Scandlines Øresund was in direct competition with the fixed link. Indeed, the latter operated a ferry service in Øresund, between the city of Helsingør and the city of Helsingborg, approximately 65 km from the Øresund fixed link. The applicants, in their capacity as owners of Scandlines Øresund, therefore operated on the same market as the fixed link, even though that market must be defined as narrowly as possible, namely as being limited to Øresund.
39In that regard, it is apparent, first, from paragraph 14 of Commission Decision COMP/A.36.568/D3 of 23 July 2004, which is set out in Annex C.2 to the reply, that the Helsingør-Helsingborg route carried all, or almost all, traffic in Øresund before the creation of the fixed link. Moreover, the Commission confirmed those facts at the hearing. Second, it follows from the Øresund 2001 Annual Report, which is set out in Annex A.7 to the application, that, approximately 18 months after the opening of the fixed link, the latter held, in respect of that strait, a market share of 62% for cars, 58% for buses and 31% for lorries. It therefore automatically and necessarily follows that there was a substantial reduction in Scandlines Øresund’s market share on the Helsingør-Helsingborg route as a result of the creation of the fixed link.
40As regards the Commission’s argument that, in a growing market, an undertaking’s market share may decrease, without this meaning that it has suffered a substantial adverse effect to its business, it should be borne in mind that, in any event, in accordance with the case-law referred to in paragraph 35 above, the grant of aid can also have an adverse effect on the competitive situation, for example, by causing the loss of an opportunity to make a profit or a less favourable development than would have been the case without such aid. Thus, in view of the finding made in paragraph 39 above, Stena and Scandlines, in their capacity as owners of Scandlines Øresund, may at the very least rely on the loss of an opportunity to make a profit or a less favourable development than would have been the case without the measure at issue.
41Indeed, irrespective of whether, as Stena and Scandlines submit, they ‘lost out on an opportunity’ due to an aggressive pricing policy adopted by the consortium combined with an annual 10% increase in traffic across the Øresund, the fixed link offered an alternative to the existing shipping route between the city of Helsingør and the city of Helsingborg, and that fixed link, as such, necessarily diverted a share of maritime traffic in the Øresund to the detriment of Scandlines Øresund.
42It follows from the foregoing that Stena and Scandlines provided evidence concerning Scandlines Øresund’s position on the market on which it had a direct competitive relationship with the fixed link, namely Øresund. They also provided evidence of a decline in market share, the loss of an opportunity to make a profit or a less favourable development than would have been the case without the measure at issue. It can thus be inferred that Scandlines Øresund would certainly have been in a more favourable situation in the absence of that measure at issue.
43In accordance with the case-law recalled in paragraphs 30 to 35 above, the abovementioned evidence is sufficient to demonstrate that the position of Scandlines and Stena, in their capacity as owners of Scandlines Øresund, was liable to be substantially affected by the contested decision.
44Such a conclusion cannot be called into question by the Kingdom of Sweden’s argument that, since they no longer owned Scandlines Øresund, Scandlines and Stena no longer had standing to bring proceedings at the time the present action was brought.
45The purpose of the examination of the applicant’s standing to bring proceedings is to determine whether the applicant is distinguished individually in the same way as the addressee of the contested decision. Standing to bring proceedings is therefore to be assessed at the time when the contested decision is adopted, or even, in a case such as the present one, at the time when the measures at issue produce their effects, since it is a question of assessing whether the applicant’s position on the market concerned is substantially affected by the aid to which the decision at issue relates.
46Accordingly, standing to bring proceedings is to be assessed at a different time from interest in bringing proceedings, which is a distinct and complementary condition of admissibility.
47It follows that the assessment of whether there is a substantial effect must be made in the light of the situation prevailing at the time when the measures at issue were granted and were liable to have an effect, as the main parties agreed at the hearing.
48It is therefore irrelevant, in that regard, that, at the time the action was brought, Stena and Scandlines were no longer owners of Scandlines Øresund.
49It follows from the foregoing considerations that Stena and Scandlines, in their capacity as owners of Scandlines Øresund, have established that they are individually concerned by the contested decision.
– Direct concern
50In their capacity as owners of Scandlines Øresund, Scandlines and Stena explain, in the first place, that the contested decision may directly affect their legal situation. They submit, in the second place, that that decision leaves no discretion to its addressees.
51The condition that a natural or legal person must be directly concerned by the decision against which the action is brought, laid down in the fourth paragraph of Article 263 TFEU, requires two cumulative criteria to be met, namely, first, the contested measure must directly affect the legal situation of the individual and, second, it must leave no discretion to its addressees who are entrusted with the task of implementing it, such implementation being purely automatic and resulting from the EU rules alone without the application of other intermediate rules (judgments of 6 November 2018, Scuola Elementare Maria Montessori v Commission, Commission v Scuola Elementare Maria Montessori and Commission v Ferracci, C-622/16 P to C-624/16 P, EU:C:2018:873, paragraph 42, and of 6 July 2022, ABLV Bank v SRB, T-280/18, EU:T:2022:429, paragraph 39).
52As regards specifically the rules on State aid, it must be noted that their objective is to preserve competition. So, in that field, the fact that a Commission decision leaves intact all the effects of the national measures which the applicant, in a complaint addressed to that institution, claimed were not compatible with that objective and placed it in an unfavourable competitive position makes it possible to conclude that the decision directly affects its legal situation, in particular its right under the provisions on State aid of the FEU Treaty not to be subject to competition distorted by the national measures concerned (judgments of 6 November 2018, Scuola Elementare Maria Montessori v Commission, Commission v Scuola Elementare Maria Montessori and Commission v Ferracci, C-622/16 P to C-624/16 P, EU:C:2018:873, paragraph 43, and of 14 April 2021, Verband Deutscher Alten- und Behindertenhilfe and CarePool Hannover v Commission, T-69/18, EU:T:2021:189, paragraph 154).
53Given that the condition of direct concern requires the contested measure to produce effects directly on the applicant’s legal situation, the EU judicature must ascertain whether the applicant has adequately explained the reasons why the Commission’s decision was liable to place it in an unfavourable competitive position and thus to produce effects on its legal situation (judgments of 6 November 2018, Scuola Elementare Maria Montessori v Commission, Commission v Scuola Elementare Maria Montessori and Commission v Ferracci, C-622/16 P to C-624/16 P, EU:C:2018:873, paragraph 47, and of 14 April 2021, Verband Deutscher Alten- und Behindertenhilfe and CarePool Hannover v Commission, T-69/18, EU:T:2021:189, paragraph 156).
54The verification that the General Court is required to carry out must not, however, lead to it ruling definitively, at the stage of the examination of the action’s admissibility, on the competitive relationships between an applicant and the beneficiaries of the aid measure. Accordingly, the applicant does not have to demonstrate which anticompetitive effects are actually produced by the national measure at issue (judgment of 30 June 2022, Danske Slagtermestre v Commission, C-99/21 P, EU:C:2022:510, paragraphs 48 and 52).
55It is in the light of those principles that it is necessary to examine the evidence put forward by Stena and Scandlines in order to demonstrate that, in their capacity as owners of Scandlines Øresund, they are directly affected by the contested decision.
56It should be noted at the outset that it is not disputed that the measure at issue leaves no discretion to its addressees.
57Stena and Scandlines submit that the criterion of determining whether the measure at issue affects their legal situation overlaps with that of demonstrating, in the context of the examination of individual concern, that the measure at issue is liable to have a substantial effect on their position on the market. The Commission does not dispute that assessment.
58In that regard, it must be noted that, as stated in paragraph 38 above, the shipping routes operated by Scandlines Øresund were in direct competition with the fixed link created by the consortium, the former operating on the same market for services and on the same geographic market as the latter. Since the consortium benefited from the measure at issue, Scandlines and Stena, in their capacity as owners of Scandlines Øresund, must be considered to have adequately explained the reasons why the contested decision was liable to place Scandlines Øresund in an unfavourable competitive position. It should be noted in that regard that, at the hearing, Stena and Scandlines stated that Scandlines Øresund was a joint venture, with the result that the decline in market share, the less favourable development or the loss of profit suffered by Scandlines Øresund as a result of the construction of the fixed link had direct repercussions for them. Consequently, the contested decision directly affected their legal situation (see, by analogy, judgment of 6 November 2018, Scuola Elementare Maria Montessori v Commission, Commission v Scuola Elementare Maria Montessori and Commission v Ferracci, C-622/16 P to C-624/16 P, EU:C:2018:873, paragraph 50).
59It follows from the foregoing considerations that Stena and Scandlines, in their capacity as owners of Scandlines Øresund, have established that they are directly concerned by the contested decision.
60Consequently, Stena and Scandlines, in their capacity as owners of Scandlines Øresund, have demonstrated, to the requisite legal standard, that they have standing to bring an action for annulment against the contested decision.
Interest in bringing proceedings
61Scandlines and Stena, in their capacity as owners of Scandlines Øresund, clarify that the annulment of the contested decision will have legal consequences for their situation, since it will have the effect of prohibiting the grant of ‘[any] aid’ and allowing the ‘recovery of aid already granted’.
62The Kingdom of Denmark contends that Stena and Scandlines do not have a vested and current interest in the annulment of the contested decision, since they were no longer owners of Scandlines Øresund at the time they brought their action.
63The existence of a current and vested interest in bringing proceedings presupposes that the action must be liable, if successful, to procure an advantage for the party bringing it until the final decision (see, to that effect, judgment of 4 September 2018, ClientEarth v Commission, C-57/16 P, EU:C:2018:660, paragraph 43).
64The possibility of an action for damages suffices to justify an interest in bringing proceedings, in so far as that interest is not hypothetical (see judgment of 15 July 2025, ECB and Commission v Corneli, C-777/22 P and C-789/22 P, EU:C:2025:580, paragraph 94 and the case-law cited).
65However, as regards the consequences of the alleged unlawfulness of the contested decision and the damage for which they seek compensation, Stena and Scandlines submit, in essence, that, in their capacity as owners of Scandlines Øresund, they suffered losses amounting to several hundred million euro, taking into account both the decline in the market share and a less favourable development than would have been the case without the construction of the fixed link during the 14-year period that Scandlines Øresund was in direct competition with the fixed link.
66Stena and Scandlines state that they were owners of Scandlines Øresund at the time Scandlines Øresund incurred the losses referred to in paragraph 65 above and infer from this that it is they who have an interest in obtaining compensation for the damage suffered as a result of the infringements of State aid law. They add that, at the time of the sale of that company, no additional payment was made by the purchaser in respect of those losses. At the hearing, they stated that, at the time of that sale, the losses recorded by Scandlines Øresund as a result of the construction of the fixed link had been passed on to each of them.
67Therefore, in the light of the case-law cited in paragraph 64 above, it must be held that Stena’s and Scandlines’ interest in bringing proceedings against the contested decision, in their capacity as owners of Scandlines Øresund, cannot be regarded as purely hypothetical, despite the sale of Scandlines Øresund before the present action was brought.
68Stena and Scandlines, in their capacity as owners of Scandlines Øresund, have therefore demonstrated, to the requisite legal standard, that they have an interest in bringing proceedings for annulment of the contested decision. It follows that their action is admissible.
69As regards the admissibility of the action in so far as it is brought by Stena and Nordö Link, in their capacity as ferry route operators, it should be noted that the applicants have brought one and the same action. Where one and the same action is involved, as soon as one of the applicants has standing to bring proceedings for annulment, there is no need to consider whether or not that is the case for other applicants, except where considerations of procedural economy exist (see, to that effect, judgment of 23 September 2015, ClientEarth and International Chemical Secretariat v ECHA, T-245/11, EU:T:2015:675, paragraph 97 and the case-law cited).
70In the present case, even if a separate examination of the admissibility of the action brought by Stena and Nordö Link, in their capacity as ferry operators, were to reveal that they do not have standing to bring proceedings or do not have an interest in bringing proceedings, the Court would nonetheless have to examine the action in its entirety. There are therefore no grounds of procedural economy that would justify the Court departing from the abovementioned case-law (see judgment of 23 September 2015, ClientEarth and International Chemical Secretariat v ECHA, T-245/11, EU:T:2015:675, paragraph 98 and the case-law cited).
71In the light of all the foregoing, the plea of inadmissibility raised by the Commission must be rejected and the action declared admissible.
Substance
Preliminary observations
– Creation of the consortium
72The intergovernmental agreement was concluded on 23 March 1991. It was ratified by the Kingdom of Denmark on 24 August 1991 and by the Kingdom of Sweden on 8 August 1991. It then entered into force on 24 August 1991.
73Article 10 of the intergovernmental agreement provides that it is incumbent on the Kingdom of Denmark and the Kingdom of Sweden each to form a limited liability company, wholly owned by the Member State concerned. That article further provides that those companies must, in turn, form a consortium which owns the fixed link, and is responsible inter alia, on their joint account and as one entity, for the financing, building and operation of the fixed link.
74Thus, the holding company Sund & Bælt Holding A/S, wholly owned by the Kingdom of Denmark, was established. That undertaking then established the limited liability company A/S Øresundsforbindelsen. Similarly, the Kingdom of Sweden formed a limited liability company, Svensk-Danska Broförbindelsen AB, wholly owned by that Member State.
75On 27 January 1992, Øresundsforbindelsen and Svensk-Danska Broförbindelsen concluded a partnership agreement to establish the consortium, to be owned on a fifty-fifty basis by each of them (‘the consortium agreement’). The consortium was provided with initial capital, by its two parent companies, of a total of EUR 6.7 million, in accordance with Article 11 of the intergovernmental agreement and Article 4(1) of the consortium agreement. Under Article 11 of the intergovernmental agreement and Article 3 of the consortium agreement, those two parent companies are jointly and severally liable for the consortium’s obligations vis-à-vis third parties.
– Legal framework relating to the measure at issue
76Article 11 of the intergovernmental agreement provides that the consortium is to raise loans to finance the fixed link. Article 12 of that agreement provides that the Kingdom of Denmark and the Kingdom of Sweden are jointly and severally to guarantee the obligations in respect of the consortium’s loans and the other financial instruments used in connection with the financing of the fixed link. Similarly, Article 4(3) of the consortium agreement provides that, in accordance with the intergovernmental agreement, the capital requirements of the consortium are to be satisfied by obtaining loans or the issuance of financial instruments in the open market, with the Swedish and Danish State guarantees.
77Article 14 of the intergovernmental agreement provides that the costs of designing, constructing, maintaining and operating the fixed link are to be fully covered by the consortium through user charges.
78The intergovernmental agreement was implemented in Danish and Swedish legislation in 1991.
79In that context, the Danmarks Nationalbank (National Bank of Denmark), which manages the public debt on behalf of the Danish Ministry of Finance, assumes the guarantee obligation towards the consortium on behalf of the Kingdom of Denmark.
80By two decisions, one adopted in 1993 and the other in 1994, the Kingdom of Sweden authorised and obliged the Riksgäldskontoret (National Debt Office, Sweden) to administer and issue guarantees on its behalf to cover the consortium’s financing needs for costs related to the construction and operation of the fixed link, in accordance with the intergovernmental agreement.
81Tripartite cooperation agreements were concluded between the National Bank of Denmark, the Swedish National Debt Office and the consortium. According to the statements made by the Kingdom of Denmark and the Kingdom of Sweden during the procedure before the Commission, those agreements were concluded in order to give them the opportunity to monitor and influence the consortium’s financing policy, to ensure that the consortium does not exceed its mandate, to follow a financing policy that minimises the long-term risk for them and to ensure that the aid granted to the consortium does not go beyond what is necessary. In essence, those agreements are intended to establish guidelines with which the consortium must comply, it being specified that financial transactions falling outside the scope of those guidelines must be approved by the National Bank of Denmark and the Swedish National Debt Office.
– Implementation of the measure at issue
82The consortium raised loans in order to meet its liquidity needs during the planning and construction of the fixed link. To that end, the consortium entered into several types of financial transaction, which included issuing bonds under bond programmes, concluding individual loans, obtaining credit facilities and entering into derivatives contracts, each transaction having its own maturity date. It follows from the exchanges between the Commission and the two Member States concerned that the consortium’s debt was regularly refinanced with the purpose of reducing the overall financing costs.
83The financial transactions referred to in the previous paragraph were the subject of guarantee agreements, creating directly applicable obligations for the Kingdom of Denmark and the Kingdom of Sweden. Those agreements were unconditional. In the event of default by the consortium, investors could address claims directly to the National Bank of Denmark and the Swedish National Debt Office.
84For example, two Medium-Term Note (MTN) bond programmes were established. The consortium’s first bond programme, which was directed towards the European market and known as the EMTN programme, was established on 21 September 1995 and is updated on an annual basis in order to comply with the ongoing information obligations on the financial markets, to reflect an update of risk factors and to supply correct information to the market, in particular on the consortium, its management and certain important events. The second bond programme, which was directed towards the Swedish market and known as the Swedish MTN programme, was set up on 2 December 1996 and is updated on an ad hoc basis.
85Each time bonds were issued under the EMTN programme, the National Bank of Denmark and the Swedish National Debt Office confirmed that those bonds were subject to the deed of guarantee signed by the Kingdom of Denmark and the Kingdom of Sweden on 21 September 1995. That deed of guarantee provided that, if the consortium failed to pay a guaranteed sum when due and payable, those two Member States undertook to pay the sum due unconditionally, within four days of receiving a written request from the holder. The Kingdom of Denmark and the Kingdom of Sweden explained, in the context of the procedure before the Commission, that the National Bank of Denmark and the Swedish National Debt Office did not issue a specific guarantee for each individual bond, but confirmed that an already issued deed of guarantee covered the bond in question.
86Bonds issued under the Swedish MTN programme were also subject to a guarantee from the States concerned, under a deed of guarantee issued on 2 December 1996. Each time an individual bond was issued under that programme, it was approved by the National Bank of Denmark and the Swedish National Debt Office, without explicitly mentioning that the deed of guarantee covered the bond in question.
87Lastly, it should be noted that, in the contested decision, the Commission chose to use the expression ‘State guarantee model’ to refer to the overall arrangement consisting of a joint and several guarantee obligation of the two Member States concerned, deriving from Article 12 of the intergovernmental agreement and Article 4(3) of the consortium agreement and implemented by Danish and Swedish legislation, it being specified that the administration of that obligation is the responsibility of the National Bank of Denmark and the Swedish National Debt Office and that that obligation is implemented by means of specific guarantee agreements.
The first plea, alleging that the Commission incorrectly classified the measure at issue as one single individual aid
88By their first plea, the applicants submit, in essence, that the Commission erred in finding, in recitals 362 to 388 of the contested decision, that the State guarantees granted by the Kingdom of Denmark and the Kingdom of Sweden to the consortium constituted one individual aid granted on the date on which the consortium was established, namely 13 February 1992.
89The first plea is divided into three parts. By the first part, the applicants claim, in essence, that the State guarantees at issue were wrongly ‘grouped together’ to constitute one single individual aid, whereas each guarantee should have been regarded as an individual aid measure. By the second part, they submit that, at the very least, each State guarantee should have been considered as individual aid due to the implementing measures adopted. By the third part, the applicants claim that, in any event, each guarantee should have been regarded as individual aid granted with each payment, and not on the date on which the consortium was created, with the result that the limitation period should have started to run on the date of each payment, and not on 13 February 1992.
– The first part, concerning the classification of each guarantee as individual aid
90The applicants submit, in essence, that, if the State guarantees provided for in the consortium agreement and the intergovernmental agreement could not be classified as an aid scheme within the meaning of point (d) of Article 1 of Council Regulation (EU) 2015/1589 of 13 July 2015 laying down detailed rules for the application of Article 108 [TFEU] (OJ 2015 L 248, p. 9), the Commission should have made an individual assessment of each guarantee.
91The Commission, supported by the Kingdom of Denmark and the Kingdom of Sweden, disputes those arguments.
92As a preliminary point, it should be noted that the applicants do not dispute the conclusion drawn in recitals 362 and 364 of the contested decision that since the measure at issue is linked to a specific undertaking and project, it does not constitute an aid scheme within the meaning of point (d) of Article 1 of Regulation 2015/1589 and should therefore be classified as individual aid.
93In the first place, it should be noted that, in the contested decision, having ruled out classification as an aid scheme, the Commission examined whether the measure at issue consisted of individual aid granted when the consortium was established, or whether it consisted of a series of individual aid measures, granted each time a financial transaction of the consortium was guaranteed by the States concerned. Following that examination, it concluded, in recital 388 of that decision, that it consisted of one individual aid, granted to the consortium by the two Member States concerned on 13 February 1992.
94Therefore, contrary to what the applicants suggest, the Commission did not ‘group together’ several individual aid measures as one single aid. The Commission considered only whether there were several individual aid measures and concluded that that was not the case.
95Similarly, the argument that the Commission, in essence, infringed Regulation 2015/1589 by grouping the guarantees granted together as a single aid measure, thus adding a step to its reasoning, is based on a misreading of the contested decision.
96In recitals 366 to 388 of the contested decision, the content of which is disputed by the applicants, the Commission sought to determine the date of award of the aid measure at issue. In recital 367 of that decision, it stated first of all that State aid had to be regarded as being granted, within the meaning of Article 107(1) TFEU, on the date when the right to receive the aid was conferred on the beneficiary under the applicable national legislation. Next, the Commission sought to determine which measure conferred on the consortium an unconditional right to have its financing transactions for the construction and planning of the fixed link guaranteed. After examining the arguments put forward by the complainants, it concluded, in recital 388 of the contested decision, that it was the State guarantee model, as defined in recital 85 of that decision and recalled in paragraph 87 above, which conferred such a right on it.
97Accordingly, the Commission did not find, at first, that the guarantee covering each financial transaction constituted an individual aid measure granted to the consortium, before going on to consider that all of those individual aid measures had to be regarded as one single individual aid.
98In the second place, as the Commission observes, it cannot be ruled out that several consecutive interventions by the Member State concerned must, for the purposes of Article 107(1) TFEU, be regarded as a single State intervention. That could be the case in particular where consecutive interventions, having regard to their chronology, their purpose and the circumstances of the undertaking receiving aid at the time of those interventions, are so closely linked to each other that they are inseparable from one another (see, to that effect, judgment of 19 March 2013, Bouygues and Others v Commission and Others, C-399/10 P and C-401/10 P, EU:C:2013:175, paragraphs 103 and 104). Furthermore, the fact that a measure is paid in successive tranches does not change the nature of the aid as a single package (see, to that effect, judgment of 6 October 1999, Salomon v Commission, T-123/97, EU:T:1999:245, paragraph 75).
99In the present case, all the financial transactions, which included refinancing operations, guaranteed by the two Member States concerned had a single objective. That objective was to finance the planning and construction of the fixed link and was implemented by one entity, namely the consortium. Thus, those financial transactions were so closely linked that they were inseparable.
100Consequently, the Commission did not err in law in considering that the two Member States’ guarantee obligation and the measures implementing that obligation could be regarded as one individual aid within the meaning of point (e) of Article 1 of Regulation 2015/1589.
101That conclusion is not called into question by the case-law cited by the applicants, which relates to the examination which the Commission is required to carry out in the context of a State aid scheme. In particular, it cannot be inferred from the judgment of 19 September 2018, HH Ferries and Others v Commission (T-68/15, EU:T:2018:563), that there is any general obligation on the Commission to examine separately each State guarantee granted to the same beneficiary for the same project. In that judgment, the Court found only that during the preliminary examination phase of the measures at issue, the Commission had encountered serious difficulties as regards the classification of the State guarantees as an aid scheme, without ruling on the classification to be made.
102In the third place, it is necessary to reject the applicants’ argument that the legal framework of the measure at issue, defined in recital 85 of the contested decision, shows that the Commission de facto regarded the measures at issue as forming part of an aid scheme.
103In recital 85 of the contested decision, which begins with an overview of the measure at issue, the Commission stated that, for the purposes of that decision, the term ‘State guarantee model’ referred to the overall arrangement consisting of the joint and several guarantee obligation of the Kingdom of Denmark and the Kingdom of Sweden deriving from Article 12 of the intergovernmental agreement and implemented in Danish and Swedish legislation, the administration of that guarantee obligation by the National Bank of Denmark and the Swedish National Debt Office and its implementation by means of specific guarantee agreements.
104First, contrary to what the applicants suggest, the term ‘implemented’ does not necessarily have to be understood as referring to the expression ‘implementing measures’, within the meaning of point (d) of Article 1 of Regulation 2015/1589, used in relation to aid schemes.
105Second, it is true that the Commission noted, in particular in recital 85 of the contested decision, that the unconditional right conferred on the consortium was essentially based on Article 12 of the intergovernmental agreement.
106However, it cannot be inferred solely from the terminology used in recital 85 of the contested decision that the Commission erred in its substantive examination of the aid measure. Such an argument is based on a misreading of the contested decision, in that it overlooks the reasoning of that decision thus adopted by the Commission.
107In that regard, first, recitals 366 to 388 of the contested decision are intended precisely to determine which measure conferred on the consortium the right to State guarantees for the financing of the planning and construction of the fixed link.
108Second, it is apparent from recitals 362 to 364 of the contested decision that the measure at issue was not addressed to undertakings defined in a general and abstract manner, but specifically to the consortium, and that it related to a specific project, namely the planning and construction of the fixed link.
109Furthermore, it must be borne in mind that, when assessing a measure in the light of Article 107 TFEU, account must be taken of all the relevant features and their context (see judgment of 2 July 2015, France and Orange v Commission, T-425/04 RENV and T-444/04 RENV, EU:T:2015:450, paragraph 219 and the case-law cited). The Commission was thus right to take into account all the mechanisms put in place to ensure the implementation of the measure at issue and to use the expression ‘guarantee model’ when describing the general context of that measure.
110Furthermore, it is necessary to reject the argument that, because various individual measures were ‘grouped together’, the compatibility of those measures was assessed merely on the basis of the consortium agreement, and not individually. It is true that Article 22 of Regulation 2015/1589 permits the Commission to propose appropriate measures to the Member State concerned where the Commission has concluded that an existing aid scheme is not, or is no longer, compatible with the internal market. However, that provision does not apply to existing individual aid, such as the measure at issue. The Commission was therefore not required to examine the compatibility of that measure with the internal market. Accordingly, that argument must be considered to be ineffective.
111In the light of the foregoing, the first part of the first plea must be rejected as unfounded.
– The second part, raised in the alternative, relating to the classification of each guarantee as individual aid on account of the existence of implementing measures
112The applicants dispute, in essence, the finding in recitals 375 and 376 of the contested decision that aid was granted on 13 February 1992 with the conclusion of the intergovernmental agreement, Article 4(3) of which confers on the consortium the right to benefit from State guarantees for the planning and construction of the fixed link.
113The right to receive aid is granted only where the beneficiary has an unconditional and legally binding right. It has thus been held that the existence of further implementing measures entails a degree of discretion on the part of the national authorities. By adopting those implementing measures, those authorities can influence the amount of the aid, its characteristics or the conditions under which that aid is granted.
114In that regard, the applicants claim that it follows from the tripartite cooperation agreement concluded on 16 December 1997 (‘the 1997 cooperation agreement’) that the consortium must obtain approval from the National Bank of Denmark and the Swedish National Debt Office for all its financial transactions. Similarly, under the new tripartite cooperation agreement, concluded on 8 November 2004 and replacing the abovementioned 1997 cooperation agreement, those two bodies may require the consortium to cease or refrain from financial transactions falling outside the scope of the guidelines stated in its financial policy. According to the applicants, this gives rise to a right of veto regarding the commitment of the two Member States concerned to provide guarantees for the financing of the planning and construction of the fixed link.
115The applicants also submit that the Kingdom of Denmark and the Kingdom of Sweden had discretion to determine the interest rates and duration of each guarantee, which varied the extent of each advantage.
116The applicants conclude that each guarantee requires approval of the financial transaction by each of the two Member States concerned, with the result that each of those guarantees constitutes one individual aid. Thus, on 31 December 2023, the consortium raised approximately 170 loans guaranteed through various instruments.
117That conclusion is not called into question by the argument put forward in recital 379 of the contested decision that grouping the State guarantees together into a single aid measure is justified by the need to provide predictability for investors. Neither Regulation 2015/1589 nor Communication from the Commission 2014/C 188/02 of 20 June 2014 on criteria for the analysis of the compatibility with the internal market of State aid to promote the execution of important projects of common European interest (OJ 2014 C 188, p. 4) allows such a grouping. On the contrary, that concept is used in the context of the application of the market economy investor principle in order to determine whether a Member State’s contributions fall within the concept of ‘State aid’.
118The Commission, supported by the Kingdom of Denmark and the Kingdom of Sweden, disputes those arguments.
119It must be noted that State aid must be regarded as being granted, within the meaning of Article 107(1) TFEU, on the date on which the right to receive it is conferred on the beneficiary under the applicable national legislation (see judgment of 25 January 2022, Commission v European Food and Others, C-638/19 P, EU:C:2022:50, paragraph 115 and the case-law cited).
120In the present case, the Commission noted in recitals 99 and 101 of the contested decision, the content of which, moreover, is not disputed by the applicants, that that right to receive State aid is established by the intergovernmental agreement and the consortium agreement and implemented, inter alia, by the 1997 cooperation agreement concluded between the National Bank of Denmark, the Swedish National Debt Office and the consortium.
121As mentioned in recital 99 of the contested decision, the 1997 cooperation agreement provides for risk limits for the consortium’s liquidity investments and derivative transactions. That agreement also specifies certain information and reporting obligations. Similarly, it is noted in recital 100 of that decision that a supplemental agreement of October 2000, concluded between the consortium and the Swedish State, had defined guidelines for the management of loans. It is stated that, if the consortium complied with those guidelines, it would not be required to seek prior approval from the Swedish National Debt Office for each financial transaction. Furthermore, the Commission stated in recital 101 of the contested decision that the consortium was to have a financial policy containing guidelines and rules for financial management and financial risk management. It is only if the consortium were to enter into a transaction falling outside the scope of the guidelines stated in its financial policy that the National Bank of Denmark and the Swedish National Debt Office would have the right to require the consortium to refrain from that transaction.
122It follows, as stated by the Kingdom of Denmark and the Kingdom of Sweden, that any potential refusal by the National Bank of Denmark or the Swedish National Debt Office does not concern the decision whether or not to provide a guarantee. It concerns how a specific financial transaction is actually implemented. Such a refusal does not therefore call into question the commitment of the Kingdom of Denmark and the Kingdom of Sweden to the consortium as regards the financing of the fixed link. It merely means that the consortium would have to use another financial transaction. Thus, as stated in recital 374 of the contested decision, although a guarantee for one specific loan or bond could be refused, the National Bank of Denmark and the Swedish National Debt Office still have the obligation to provide all the necessary guarantees for the financing of the fixed link.
123It should also be pointed out, as the Commission has done, that the power of the two Member States concerned to determine the interest rates and duration of each debt instrument has an impact on the quantification of the State guarantee, but not on its scope, which remains limited to the costs required for the planning and construction of the fixed link.
124It follows that, contrary to what the applicants claim, neither the National Bank of Denmark nor the Swedish National Debt Office has a ‘veto right’ regarding the commitment of the Kingdom of Denmark and the Kingdom of Sweden to provide guarantees for the financing of the planning and construction of the fixed link. In the present case, the discretion conferred on those two national authorities concerns only practical conditions and rules intended to ensure the sound management of public resources, without calling into question the consortium’s unconditional right to have its financing transactions guaranteed by the Kingdom of Denmark and the Kingdom of Sweden.
125The Commission was therefore right to find that the consortium agreement involved a concrete and firm commitment by the Kingdom of Denmark and the Kingdom of Sweden vis-à-vis the consortium to guarantee the consortium’s loans needed to finance the planning and construction of the fixed link (see, by analogy, judgment of 2 July 2015, France and Orange v Commission, T-425/04 RENV and T-444/04 RENV, EU:T:2015:450, paragraph 244so that the date of award of the single individual aid which constitutes the contested measure is the date on which the consortium was established.
126That conclusion cannot be called into question by the applicants’ argument that the consortium did not have legal personality, which, in accordance with Chapter 1, Section 4 of the lag om handelsbolag och enkla bolag (Swedish Law on commercial companies and civil law companies) (SFS 1980, No 1102), deprives it of legal capacity. It is sufficient to note, as the Kingdom of Sweden has done, that the legal status of the consortium is not governed by national law, but by the intergovernmental agreement. It follows from Article 10 of that agreement and Article 4 of the consortium agreement that the companies are to form a consortium which ‘owns and is responsible, on their joint account and as one entity, for the design and financing of the construction and operation of the Øresund link’.
127Similarly, it is necessary to reject the argument that, contrary to what is put forward in recital 376 of the contested decision, Article 4(3) of the consortium agreement does not confer an unconditional and binding right on the consortium since that agreement was not concluded between the two Member States concerned.
128As the Commission states, first, the consortium agreement crystallises the guarantee obligation of the Kingdom of Denmark and the Kingdom of Sweden laid down in the intergovernmental agreement and, second, the national laws implementing that intergovernmental agreement impose on those two Member States obligations which the consortium was entitled to enforce once the consortium agreement entered into force.
129Lastly, it is necessary to reject the applicants’ argument that, contrary to what is put forward in recital 379 of the contested decision, ‘grouping’ the State guarantees together into a single aid measure cannot be justified by the need to provide predictability for investors. As is apparent from the assessment of the first part of the present plea, the applicants cannot claim that the Commission ‘grouped together’ several individual aid measures. Furthermore, that argument is based on a misreading of recital 379 of the contested decision. The requirement for stability in the financial planning for the investment was cited as a contextual element, and not as a justification. The Commission used that element to support the finding that the aid was granted on the date on which the consortium was created.
130In the light of the foregoing, the second part of the first plea must be rejected as unfounded.
– The third part, raised in the alternative, relating to the taking into account of each payment, made under each guarantee, for the purpose of determining the date of award of the single individual aid
131The applicants claim that, in order to determine whether or not the 10-year limitation period laid down in Article 17 of Regulation 2015/1589 has expired, it is necessary to determine when the State aid was granted. Accordingly, even if the State guarantees were to be regarded as one aid, it would have to be considered that the aid was granted when each guarantee was issued. It follows that the limitation period started to run afresh from the date of each aid award and, therefore, that it has not expired, contrary to the finding made in recital 436 of the contested decision.
132In that regard, the applicants note that State aid should, in principle, be regarded as having been granted on the date on which the right to receive it is conferred on the beneficiary under the applicable national legislation. However, it follows from paragraph 82 of the judgment of 8 December 2011, France Télécom v Commission (C-81/10 P, EU:C:2011:811), that, in the context of a multiannual aid payment system requiring that the aid be recalculated each time it is granted, the right to receive aid is conferred each time the aid is actually granted, and the limitation period starts to run afresh for each grant.
133In the present case, the same reasoning should apply, since the consortium is relieved of paying a premium in return for the State guarantees on a periodic basis, namely annually, quarterly or monthly, and that premium must be calculated each time a payment is due on the basis of the specific circumstances of each period.
134The Commission, supported by the Kingdom of Denmark and the Kingdom of Sweden, disputes those arguments.
135In the first place, it should be noted that the applicants submit that any advantage linked to the interest rates, duration or other characteristics of the loans is granted only at the point in time when the loans are obtained. In their view, it is therefore only at that time that the amount of advantage can be calculated.
136However, it is apparent from recital 311 of the contested decision, the content of which, moreover, is not disputed by the applicants, that the advantage granted to the consortium results not only from obtaining more favourable credit terms than it would have obtained solely on its own merits, but also from the non-payment of a guarantee premium on the outstanding debt on market terms for each financial transaction. It follows from paragraph 1 of the additional protocol to the intergovernmental agreement, referred to in essence in recital 85 of the contested decision, that what is at issue is a guarantee without financial consideration.
137In that regard, it has been held that the grant of a guarantee on terms which are not equivalent to market conditions, such as an unlimited guarantee granted without consideration, is, as a rule, liable to confer an advantage on the recipient of those terms, in that that party thereby enjoys an improvement in its financial position through a reduction of charges which would normally encumber its budget (judgments of 3 April 2014, France v Commission, C-559/12 P, EU:C:2014:217, paragraph 96, and of 20 September 2012, France v Commission, T-154/10, EU:T:2012:452, paragraph 106).
138Accordingly, an advantage such as that granted to the consortium in the present case must be regarded as continuous rather than periodic, in that it does not specifically result from a guarantee in respect of a particular financial transaction.
139It follows that, in the present case, in order to determine the existence of an advantage, within the meaning of Article 107(1) TFEU, the Commission was not required to compare the financing costs of each guarantee actually granted to the consortium with the financing costs which the consortium would have had to pay at market rates.
140Since the advantage at issue here consists of an unconditional guarantee granted without financial consideration, it was effectively known to exist when the consortium was established, namely on 13 February 1992. The Commission was therefore right to consider that, as from that date, there was no doubt that all of the consortium’s financing needs would be guaranteed by the Kingdom of Denmark and the Kingdom of Sweden without financial consideration.
141In the second place, such a conclusion cannot be called into question by the case-law referred to by the applicants. Thus, in so far as the applicants rely on an application by analogy of the judgment of 8 December 2011, France Télécom v Commission (C-81/10 P, EU:C:2011:811), and, to a certain extent, of the judgment of 12 January 2023, DOBELES HES (C-702/20 and C-17/21, EU:C:2023:1), it should be noted that, in the context of a State aid scheme, the actual grant of the aid is not to be confused with the date on which that scheme was adopted (see, to that effect, judgment of 8 December 2011, France Télécom v Commission, C-81/10 P, EU:C:2011:811, paragraph 81). In the latter case, in accordance with Article 17(2) of Regulation 2015/1589, it is the date on which the aid is actually granted to the beneficiary which is the starting point for the limitation period (see judgment of 26 April 2018, ANGED, C-233/16, EU:C:2018:280, paragraph 82 and the case-law cited).
142The case which gave rise to the judgment of 8 December 2011, France Télécom v Commission (C-81/10 P, EU:C:2011:811), concerned a multiannual aid scheme under which the undertaking in question benefited from a lower annual tax liability. The existence of an advantage in a given year could not be verified until the amount of the sum actually paid by the undertaking receiving the aid was compared with the amount of tax that was generally payable. Accordingly, in order to calculate the limitation period provided for in Article 17 of Regulation 2015/1589, it was necessary to take account of each time an advantage was granted, since the conditions for granting those advantages depended on the annual nature of the tax at issue.
143However, that is not the case here, since the advantage granted to the consortium consists of an unconditional right to receive a guarantee from the Kingdom of Denmark and the Kingdom of Sweden, without any financial consideration, for the financing of the construction of the fixed link. Such a guarantee, as noted in paragraphs 136 to 138 above, constitutes a continuous advantage rather than a periodic advantage.
144Similarly, contrary to what the applicants suggest, the application by analogy of the judgment of 8 December 2011, France Télécom v Commission (C-81/10 P, EU:C:2011:811), to the present case cannot be confirmed by paragraph 207 of the judgment of 5 May 2021, ITD and Danske Fragtmænd v Commission (T-561/18, EU:T:2021:240).
145In the judgment of 5 May 2021, ITD and Danske Fragtmænd v Commission (T-561/18, EU:T:2021:240), the General Court recalled that, in the case which gave rise to the judgment of 8 December 2011, France Télécom v Commission (C-81/10 P, EU:C:2011:811), in which the Court of Justice held that the starting point of the limitation period started to run each year, the advantage in question depended, each year, on specific circumstances. Conversely, in the case before the General Court, the applicants had not put forward any evidence capable of establishing that the amount of the premium that the undertaking receiving the aid should have paid each year, in return for the guarantee at issue, should be determined periodically on the basis of circumstances specific to each period, or even that that would be the case, in general, as regards an amount of a guarantee premium. The General Court therefore held that, irrespective of whether the measure at issue constituted a multiannual aid scheme or one individual aid, the situation at issue in the case before it was not comparable to that at issue in the case which gave rise to the judgment of 8 December 2011, France Télécom v Commission (C-81/10 P, EU:C:2011:811).
146The General Court has also pointed out that a distinction must be drawn between advantages granted on a periodic basis pursuant to the individual application of an aid scheme and the grant of an individual guarantee which could have the effect of continuously improving the situation of the beneficiary. In the latter case, the date on which the aid was granted was the date on which it was adopted (see, to that effect, judgment of 5 May 2021, ITD and Danske Fragtmænd v Commission, T-561/18, EU:T:2021:240, paragraph 208).
147That is the case here, since, as has been stated in paragraphs 136 to 138 above, the unconditional guarantee at issue, provided without financial consideration, does not constitute a periodic advantage, but has the effect of continuously improving the beneficiary’s situation.
148Similarly, in so far as the applicants rely on an application by analogy of paragraph 104 of the judgment of 7 September 2022, JCDecaux Street Furniture Belgium v Commission (T-642/19, EU:T:2022:503), it is sufficient to note that, in that judgment, the Court held that the non-payment of rent and taxes by an undertaking constituted a non-immediate advantage granted on a periodic basis, whereas the advantage at issue in the present case, the purpose of which is to finance the planning and construction of the fixed link, constitutes a continuous advantage.
149In the third place, as the Commission points out, the applicants incorrectly refer to ‘implementing measures’ within the meaning of point (d) of Article 1 of Regulation 2015/1589 in relation to the determination of a State aid scheme, whereas the implementing measures referred to in the contested decision relate to an individual aid measure.
150Even if it were possible to apply by analogy the concept of ‘implementing measures’ in the context of individual aid measures, it should be noted that that concept entails a degree of discretion on the part of the national authority, allowing it to influence the amount of the aid, its characteristics or the conditions under which that aid is granted. By contrast, the mere technical application of the act providing for the grant of the aid does not constitute such a further implementing measure (judgments of 16 September 2021, Commission v Belgium and Magnetrol International, C-337/19 P, EU:C:2021:741, paragraph 105, and of 26 March 2026, Fremoluc and Association de Promotion des Droits Humains et des Minorités, C-58/25, EU:C:2026:255, paragraph 29).
151In the present case, it follows from paragraphs 119 to 125 above that the implementing measures, to which recital 85 of the contested decision refers, do not make it possible to influence the amount of the guarantee granted, nor do they limit the consortium’s unconditional right to have the financial transactions required to finance the planning and construction of the fixed link guaranteed.
152Consequently, the third part of the first plea must be rejected as unfounded.
153In the light of all the foregoing, the first plea in its entirety must be rejected as unfounded.
The second plea, alleging failure to classify the aid as operating aid
154By their second plea, the applicants challenge recital 370 of the contested decision. They complain that the Commission wrongly concluded that the aid at issue did not include operating aid.
155According to the applicants, in paragraph 242 of the judgment of 13 December 2018, Scandlines Danmark and Scandlines Deutschland v Commission (T-630/15, not published, EU:T:2018:942), the Court held that the aid measure at issue should have expired at the point in time when the beneficiary was able, on the basis of its cash flow, to borrow on the open market without the support of State guarantees or State loans. That happens when the amount of the beneficiary’s debt has decreased to a level at which its income is likely to exceed operating costs and debt repayments under normal market conditions. The Court inferred from this that aid granted after that point in time, which the applicants refer to as the ‘market time limit’, was no longer justified and constituted operating aid.
156In the present case, it follows, first, from recital 369 of the contested decision that the fixed link was profitable after the first few years following its opening in 2000. Second, it follows from recital 116 of that decision that State guarantees were granted at least until 2018. The consortium therefore received aid well beyond the ‘market time limit’ referred to in the previous paragraph, and that aid constitutes operating aid.
157The Commission, supported by the Kingdom of Denmark, contends that the second plea is ineffective and inadmissible and, in any event, that the measure at issue does not constitute operating aid.
158It should be borne in mind that the question whether an aid measure may be classified as operating aid arises in the context of the examination of the compatibility of the aid measure at issue, and not at the preliminary stage of the classification of the measure as State aid within the meaning of Article 107(1) TFEU.
159The concept of ‘advantage’ that is intrinsic to the classification of a measure as State aid is an objective one, irrespective of the motives of the persons responsible for the measure in question. The nature of the objectives pursued by State measures and their grounds of justification have no bearing whatsoever on whether such measures are to be classified as State aid (judgment of 8 December 2011, France Télécom v Commission, C-81/10 P, EU:C:2011:811, paragraph 17).
160Furthermore, Article 108(1) TFEU gives the Commission the power, in cooperation with Member States, to keep under constant review all systems of aid existing in those States (judgments of 18 July 2013, P, C-6/12, EU:C:2013:525, paragraph 40, and of 1 August 2025, Tiberis Holding, C-514/23, EU:C:2025:597, paragraph 53), and not to review existing individual aid measures.
161Similarly, Article 108(3) TFEU gives the Commission the power only to examine the compatibility of a new, lawful or unlawful, aid measure.
162Recital 371 of the contested decision, which is disputed by the applicants, concerns the examination of the classification of the measure at issue as State aid. Following that examination, the Commission concluded that that measure constituted existing aid. First, that individual aid was granted on 13 February 1992, with the result that, pursuant to the 10-year limitation period laid down in Article 17(3) of Regulation 2015/1589, read in conjunction with Article 1(b)(iv) of that regulation, it must be classified as existing aid. Second, since the aid was granted prior to the accession of the Kingdom of Sweden to the European Union, it also constitutes, as regards that State, existing aid on the basis of Article 1(b)(i) of that regulation.
163It follows that, since the measure at issue does not constitute new aid, but existing aid, the Commission was not required to review its compatibility with the internal market.
164In the light of the foregoing, the second plea must be rejected as ineffective.
165In the light of all the foregoing considerations, the action must be dismissed without it being necessary to rule on the admissibility of the written notes which the applicants produced for their oral submissions on the day before the hearing, namely 3 March 2026, and which contain no new evidence.
Costs
166Under Article 134(1) of the Rules of Procedure of the General Court, the unsuccessful party is to be ordered to pay the costs if they have been applied for in the successful party’s pleadings.
167Since the applicants have been unsuccessful, they must be ordered to pay the costs incurred by the Commission, in accordance with the form of order sought by the Commission.
168Under Article 138(1) of the Rules of Procedure, Member States which have intervened in the proceedings are to bear their own costs. The Kingdom of Denmark and the Kingdom of Sweden must therefore bear their own costs.
On those grounds,
THE GENERAL COURT (Fourth Chamber),
hereby:
1. Dismisses the action;
2. Orders Scandlines Danmark ApS, Scandlines Deutschland GmbH, Stena Line Scandinavia AB and Rederi Aktiebolaget Nordö-Link to bear their own costs and to pay those incurred by the European Commission;
3. Orders the Kingdom of Denmark and the Kingdom of Sweden to bear their own costs.
De Baere
Meyer
Jočienė
Delivered in open court in Luxembourg on 25 November 2026.
T. Henze
S. Papasavvas
Acting Registrar
President
* Language of the case: English.
Lignende dokumenter
- JUDGMENT OF THE GENERAL COURT (First Chamber) 28 February 2024 EU-domme · 28. februar 2024
- Bekendtgørelse af protokol nr. 14 af 13. maj 2004 til konventionen til beskyttelse af menneskerettigheder og grundlæggende frihedsrettigheder om ændring af konventionens kontrolsystem Retsinformation · 4. juni 2010
- Bekendtgørelse af protokol nr. 14 bis af 27. maj 2009 til den europæiske konvention til beskyttelse af menneskerettigheder og grundlæggende frihedsrettigheder Retsinformation · 9. januar 2010
- Domstolens dom (Første Afdeling) af 6. oktober 2021. — Scandlines Danmark Aps og Scandlines Deutschland GmbH mod Europa-Kommissionen. EU-domme · 6. oktober 2021
- ORDER OF THE PRESIDENT OF THE GENERAL COURT 13 September 2019 EU-domme · 13. september 2019
- Landsretten stadfæster byrettens dom i sag om overtrædelse af straffuldbyrdelseslovens § 55 a, stk. 1, jf. § 123 b, stk. 1 Domsdatabasen · 13. marts 2025